Transcript: Council Meeting - 23 Nov 2026
Generated by YouTube's automatic captions, uncorrected: names and place names are often misheard, and no one has checked it. The time beside each paragraph opens the recording at that point. Download as JSON. Notes from the summarizer: The captions contain frequent speech-recognition errors in names, place names, units and bylaw citations. The solid-waste rate is rendered once as $42.75 in the spoken caption, but the agenda states $402.75 and the stated $15.35 increase and 3.96% rise support $402.75; that amount is used above. The municipal ticket bylaw is also inconsistent: the agenda heading says No. 4946, while the director corrected the bylaw read at the meeting to No. 4846. The official motions list supplied for this analysis is empty, so no motion moments can be matched or quoted.
Hey, councelor. Just checking to see if you can hear me online. Thanks. Yeah, I can hear you. Can you hear me? Um I I I think you're a little quiet. If you were Okay. Do you want me to speak up? Oh, yeah. That's just a little bit better, but maybe a little bit louder would be perfect for the room. Okay. Thank you. I'll try when I'm speaking. Thanks. Thank you so much.
Check
Good evening everyone and uh welcome. We have our regularly scheduled council meeting for November 23rd, 2026. Uh as we gather in this meeting, we always like to acknowledge that we do our business on the traditional territories of the coast and straight Zish peoples specifically recognize the Kongan people known today as the Songhes and Esqua nations and their how their historic connections to these days uh continues to this day. Uh our first order of business is approval of the agenda. Can I have a mover and seconder? Moved and seconded. Any discussion? I will point out that we have councilors uh Braithweight and Gleon joining us online this evening. Um but they are here online. Uh so if there's uh don't see any discussion on the agenda. So all those in favor? Any opposed? None opposed. Uh we have adoption of minutes. We have three different um minutes here. There was a couple of uh changes made to the inaugural council. Nothing major. Just some additional clarification of language. Um so I can have a motion to adopt all three and then we can take a
motion moved. Thank you. Seconded. Are there any other changes, corrections or amendments on those? Looking online as well. Please speak up if you have anything to add or raise your hand in the thing. But speaking is probably important because I'll move through these procedural pieces fairly quickly. Uh seeing none. All those in favor? Any opposed? None opposed. And then we just receipt of the uh committee minutes. So 4.1 moved and seconded. Thank you. Um we don't receate since we don't change them. All those in favor? Any opposed? None opposed. Uh my remarks are brief this evening. First, welcome everybody. It's certainly feels like a fall near winter night tonight. Um we do have a couple of events coming up in the community. Uh one, uh there's Christmas in Estan Village coming up this uh this weekend. Uh so that's Friday from 12:00 to 6:00 and Saturday from 11 till 3. So Estan Village has they decorate and they have special sales and the retailers there uh welcome visitors for those two days. So that's this Friday and Saturday. Uh this Sunday is the light up
on Oak Bay Avenue. This is put on by the business improvement association. It's a great event. Uh Mr. and Mrs. Claus are expected to attend as well, but great fun for all ages. Uh we have the leted park parade of course happening the following weekend on the Saturday December 5th and uh more community business. We do have uh openings for volunteers for our committees and commissions. Uh these are advisory bodies that serve the community and uh those will will be closing on December the 4th. So, if anybody here or online or anybody you know may be interested in gifting some of your knowledge and experience to the community, uh we really appreciate people stepping forward and and serving on those uh boards, committees, and commissions. And that's all my comments for tonight. So, fairly brief. Um we move to the public comment and question period. U this is a a portion of the meeting that we invite members of the public either online or in person. If you're online, it asks that you use the Zoom app to raise your hand to indicate your desire to speak.
Um, but this is a basically to address council on matters related to municipal business but not related to items on the agenda tonight. We'll have the opportunity for uh where areas allow for public participation uh to provide uh that input. So, this is just an open call we have at every meeting to allow the public to address council. I think the people in the room here are attached to land use applications. So, uh, perhaps looking online, I don't see any hands raised. So, I'm going to do a final call here to see if there's anybody on online who wishes to speak to council about matters not on the agenda tonight.
Again, I think the ones online I see are are related to the application. So, uh, we don't have public comment and questions coming forward. So, we will move to the first order of business, which is item 7.1. Uh, this is part of a reports and memorandums. This item is not open for public input. It's just a a report for receipt of information related to the housing supply act. Um with that, I will hand this over to Mr. Green, our deputy director of community building and planning. Welcome. Uh good evening worship members of council. Uh this report relates to the housing target order that the districts received back in 2023 under the housing supply act. And whilst there's been some speculation in relation to housing targets as well as bill 44 until those uh legislation or that legislation those two pieces of legislation is repealed or amended or eliminated by the new provincial government u and until we receive sort of ministerial direction to the contrary staff will continue to
comply with the legislation. Uh and then in relation to this report that requires us to submit uh the report for period three to um to the provincial government within 45 days of the end of that period. Uh that being said and should the legislation be repealed, staff will continue to compile and monitor the housing data that we've been collecting and doing for the for the last three years as it has provided some useful information to help monitor the supply of new housing units. uh and provide staff with valuable data and evidence base that can be used to help inform and monitor housing trends, policies and regulations as well as growth levels going forward within the district which can also be useful to help monitor other bylaws including our ACC dcc bylaw in relation to growth levels and help us to inform those any amendments to those bylaws in the future. My colleague Julie Cook will now provide an overview of the uh the details in the report and both happy to answer any questions that council may have on the on the report.
Uh thank you very much and welcome Miss Cook. All right. Thank you and good evening mayor and council. This report relates to the year three progress report for Oak Bay's housing target order. I'd like to start by acknowledging some errors with the data found in the attachment one um which is the year three progress report form which we are required to send to the province. There were a few miscalculations with the numbers which I've uh clarified and amended in an email to you earlier. Since sending this email, staff would like to acknowledge one more error with the updated numbers in relation to section six and attachment one. This was amended to 42, but the correct number is 38 and this reflects the proposed new dwelling units associated with declined applications.
Staff apologize for any confusion that this may have caused and are happy to answer any questions related to those amendments. Um, now back to the year 3 progress report data. In year three, 56 56 net new dwelling units were completed, which brings the cumulative net new dwelling units since the housing target order was issued to 92 net new dwelling units. The housing target order set by the province for year three is for 258 net new dwelling units and therefore the district did not meet the housing target set out in the order. Nonetheless, the district did see an increase in the number of dwelling units completed and has consistently increased the number or increased housing supply since the housing target order was issued.
The data indicates that this has been influenced by zoning bylaw regulation changes, notably the introduction of regulations for secondary suites in 2022 and the implementation of small-scale multi-unit housing regulations in 2024. The data demonstrates that the completion of new dwelling units under these changes generally take about two years and they do have an impact on housing supply both in terms of overall housing supply numbers as well as the typologies that are delivered. In year three, new typologies were delivered for the first time since the housing target order was issued, including duplexes, triplexes, and forplexes. The district does have a pipeline of 103 uh dwelling units for approved permits which include building permits, resoning, and development permits. When combined with instream applications that the district is currently processing, there's a potential of approximately 362 new dwelling units subject to the outcome of the instream applications.
In terms of housing related initiatives, in year in year three, the district completed and started a number of different initi initiatives, including the OCP, updating the OCP in December 2025, and delegating the a number of minor permits to staff. Staff are are also currently working on a number of other housing initiatives, including undertaking an infrastructure servicing study, modernizing the zoning bylaw, and considering pre-zoning options, updating our subdivision works and services bylaw, and optimizing our development processes. To sum up the year three progress report, the district did not meet its housing target order, but did see a steady increase in the supply of housing. Single family dwellings and secondary suites remain as the most common typology. Um but year three did see changes um in the typologies that were delivered. Since the housing target order was issued, one and three bedroom units are the predominant unit sizes delivered. As discussed before, staff are still working on a number of housing related initiatives that are aimed at
further increasing the housing supply in the district. Thank you and we're happy to take any questions that you may have. Thank you very much, Miss Cook. Uh as noted the procedure here is really to receive this for information which will trigger the uh submission to the province. Um but opportunity for questions from members of council uh either in person or online. Um you can I probably prefer if people online use the digital hand raise because it makes it easier if I'm not glancing over at the moment of hand raising but I'll go in the room here first. Are there any questions for staff from people here? Go ahead councelor Patterson.
Yes. Thank you mayor. And it's kind of with the housing, I guess it's hurry up and wait now while we find out what's going to what what the new direction will be from our new government. But I guess um so thank you for the report and um I'm trying to assess whether we can glean some information that is still relevant and and useful um as we move forward through this. And of course the report does uh uh reference the infrastructure servicing study that's in progress to accommodate this. Um but what about the uh the other pieces that would also go with it because certainly infrastructure is directly relational but if you have population growth there's um there are other facilities like like recreation that also have to service needs. So I'm just wondering how we will how that information will eventually start to come together for council to be able to understand the the full spectrum of of what has to be considered together realizing some will
also be provincial because education, child care, all of those things tie into whatever the population growth is. So um do we have any idea of how uh we will monitor that and gather useful information by which we can make decisions. Mr. Green through your worship to councelor Patterson. Yes. The infrastructure servicing study is not just looking at pipes in the ground. It's not just looking at sanitary storm and sew. It's also looking at community recreation facilities as well as emergency services. Uh and so it's I guess twofold. The purpose of that study is to help inform prezoning options uh where the infrastructure is that could support prezoning and and vice versa, but also to potentially also uh inform where we might want to make changes or updates to the both the ACC bylaw and the DCC bylaw in case there are further projects that should be identified and placed in those two bylaws to uh where we do pre-zone that we have the ability then to secure ACC and DCC to help pay for those uh
those costs of growth. both and so both u engineering as well as parks and recreation services and emergency services are involved in that study as well and we'll be uh hopefully bringing a report to council with those options and uh uh the implications of that servicing study to council in in likely in the new year in probably Q1 Q2 of new of the new year. Thank you. Anything else counc? Yes, thank you Mary. Thank you for that information. I I appreciate that um that that that staff are working together as as a team to to um to gather that information uh so that we can use it for information. I guess also um on page 11 the when it showed the number of net new housing units, it showed 73 completions and there was 17 demolitions. And I know the demolitions and the and the uh net new units may not completely harmonize, but uh it's still that's about 23% of the housing the demolitions lost for
that which seems to I don't know if it's high. I don't know if it's high in comparison to other municipalities, mature univer um municipalities like Oak Bay. Um but it's it just seems like we are creating um a lot of loss of housing and potentially waste also that um this is for this period but I you know are we is a cumulative um impact of this also something that we should maybe be looking at as uh as a council and uh with staff have that information. I took it more as a rhetorical question in the sense that it was a piece. I mean the 25% if you're taking down one to build four which is the infill we have that's that's the right ratio basically is one and four. So I I don't think it's a surprise and probably will continue if there's if there's four plexes being added but Mr. Green is there anything else you want to add.
Only that obviously that number would also include where somebody demolishes or moves an existing single family dwelling and replace it with a new single family dwelling. It's not just a demolition in relation to a net new dwelling unit. It would also capture any replacement light for like replacement as well. Thank you uh councelor Braithweight online. Thanks very much. Mayor, can you hear me? Hear you. Please continue. Yeah. Thank you so much. Um and thank you to staff for the preamble because it they answered quite a number of my questions in their preamble. So that was great. Um and I just I have a couple of more questions. Um the first one would be and it's around um the fact that we haven't really delivered any below market um or supportive housing um so far. Um and I'm wondering if we have any projects in the pipeline that would deliver below market or supportive housing.
I'll give that over to Mr. Green uh through your worship to council. you know, we're not we don't have any current applications in that are under review or instream that are below market or supportive housing. Thank you. Other I would argue the student housing being provided at Kimos is is definitely would well not technically under that category would would provide that but go ahead council brief. True. Thank thank you and thank you for pointing that out. Um thank you. And then um of the 362 units that we have in the pipeline right now um how many do we think realistically um are expected to receive uh occupancy permits before let's say September 30th 2028?
I guess we'd be looking at 2028 for the end of our five years. Sure. Mr. Green, I recognize that those are not all approved. Those are just in the pipeline. So um but are are they all would they all be scheduled for for building before that date through your worship to council breakthrough? It's hard to say in terms of the expected time scales of you know particularly if someone is still at the resoning stage they are probably not going to get in the ground before or have occupancy in place depending on the I guess ultimately depends on the scale of the project. If it's essentially a a couple of your units, then that's probably achievable to go for a reszoning and then to if there's a subdivision process needed or if they're going straight to a building permit, then two years is probably what you're you're looking at to get occupancy on a a relatively small project. You know, Kimosan College, for example, the building permit was issued uh around July time. uh they are now in the
ground, but they're hoping to have those units ready by sort of the summer of 2028, but they they'd have some delays, but we know that they are trying to uh have that building opening for the the fall of 2028. But again, ultimately, it depends down to how quickly somebody acts upon a resoning and then gets all the other necessary permits in place and then gets their building permit and then starts construction. So there's a few unknowns depending on the scale and complexity of the project. Okay. Thank you. Thank you, Mayor. And if I may continue. Yeah. Um I'm wondering also um we there was a little bit in the report about um delegation and I'm wondering if we know uh what um specific approvals are being considered for further delegation um and what criteria I actually No, I'll just I'll leave it at that. um because I I I also wonder um if we have any opportunity to reconsider decisions made under delegated authority. So I guess the the question is what specific approvals are being considered for further delegation and uh do we have any
opportunity to review or reconsider decisions made under the delegated authority? Sure. I'll give that over to Miss Cook. Thank you through you, Mayor. Um yeah, so staff are currently reviewing our delegated approval options. um looking at potential of uh partial delegation of the heritage procedure bylaw in related to community heritage register properties. Also looking at some of the environmental development permits and strata conversions. Um looking at options so not necessarily delegation of all but um considering uh where it may be appropriate. Um and if councelor Braithweight could uh just clarify the second half of that question please. Council. Yeah, it was around um uh would we have would council have an opportunity to review or reconsider decisions uh that were made under the delegated authority?
Uh Mr. Green, you're talking about like a staff had delegated authority, they approved something and does council have a chance to review that? Okay, Mr. Green, I don't think through worship to council braith. So I'm presuming if if a staff had issued a minor development variance permit and then council wants to overturn that decision by the director. I don't believe that there will be an opportunity uh to do that once council has delegated that authority to staff in relation to a certain type of permit then uh I don't believe that there will be opportunity for council to review or to uh overturn that decision of of staff.
Okay. Thank you. Um, and then my last question was um uh there there was a little talk in the in the report about uh um the processing times for some applications and I'm wondering if we have an an actual average processing time for applications um once the application is completed just on an average because there's a lot of figures going out flying around out in the community and I thought better to be taken right from the horse's mouth. So there you go. Three worship to council bra the weight. Uh we keep processing time uh for all types of applications going back for the last five years and so it depends on the type of application because um the averages for certain types of applications will be different from other types of applications. Uh but we generally have an average processing time which is essentially based on yeah the number of applications divided by the the amount of time each application took from uh initial uh submission to decision date. Okay. Thank you. Thank you councelor Brweight.
I don't see any other hands online from council or from any members in here. So see no hands. I'll just take a motion to receive. Thank you. Moved. Is there a second? Thank you. And uh any other questions or comments before we move on to call the question? Go ahead, Councelor Green. I just have a I I just have a minor question through you, Mayor. Um and I'm just I I was rereading the letter from the minister that appears at the end of the report uh for staff's reference. Um and at the bottom there's a a a CC and it it references District of Oak Bay housing targets branch. Do we actually have a housing targets branch? I was not aware of that.
Um but I and it's a it seems like a minor question but it does u make a statement. So I just wondered if if that was um a typo from the minister's office by any chance. Thank you. Thank you for the question through you mayor. So um I can see how that appears that it's a continuation of the first line but that's actually a reference to the provincial housing targets branch which has a generic inbox uh where we send our progress reports. I appreciate that. Thank you. Thank you. Seeing no other hands, I'm going to call the question. All those in favor? Any opposed? None opposed? That goes off to the province. Uh we move now to items 8.1, 8.2, and 8.3, which all relate to our uh fees and services. They are all subject to public input. Uh I am happy to take public input on um all three of these at the beginning just so that if there's any any questions about any three, we can do that. Actually, no, I'll do them in I'll do them in order.
I'll call for public input on each one. Um, but if you have questions, I'm going to just ask for people to raise their hands quickly u because we may or may not spend a lot of time uh uh on these. So with that, I'll move to 8.1, which is the 2027 water utility rates bylaw and budget. I give it over to Miss Lockhart, our director of finance. Thank you. Good evening, Mayor and Council. This report seeks council's approval of the proposed 2027 water utility rates, including consumption charge of $4.88 88 cents per 100 cubic meters and a fixed daily charge of 98 cents per day. The proposed 2027 budget includes an increase of $437,964 or 6.6% over 2026. The primary drivers are higher CRD bulkwater costs, which account for over 42% of the increase, along with continued contributions to reserves to support long-term replacement and renewal of water infrastructure and increase um and increases related to finalized collective agreements. Consistent with council's approved asset management strategy, reserve contributions continue to increase to support the sustainable,
renewable, and replacement of the infrastructure. The 2027 budget includes an additional $165,000 in asset management reserve funding, representing 2.5% of prior year revenues. This contribution helps reduce reliance on future borrowing, significant rate increases, and onetime funding sources while maintaining service levels. Based on the proposed rates, the average residential customer can expect an increase of approximately $5910 per year with actual impacts varying based on water consumption. The proposed rates will maintain current service levels, support ongoing operational requirements, and ensure the utility remains financial financially sustainable while meeting future infrastructure replacement needs. Staff recommend that council approve the proposed water utility rates and give first, second, and third readings to the bylaw amendment. And with that, myself and Steve Renick are ready to take any questions you have. Thank you.
Thank you very much, Miss Lockhart. Just for clarification, when you read aloud, you said per $488 per 100 cubic meters, but I think it's 100 cubic feet. Uh, and the pieces just the audio was I think just missed spoken on that. Good old Canada where we mix our imperial and metric on almost everything. Thank you. Uh, are there questions for staff? Yes, go ahead. Thank you very much through you, mayor. Uh, just a couple of observ one observation and a question. Uh, I wouldn't ordinarily notice postage, but I do notice it here that in 2026 and 2027, the amount was the same. And of course, we've just had this, I think, a week or two ago. The federal budget has lifted uh postage starting January 1st, 2027 by 40%. So, that will be a notable hit uh right out of the gate. Um but my my question is about the reference to uh the in 2023 the CRD debt servicing component was moved from uh this uh utility to property tax and uh I'm just
wondering if you could help me with what was the initiative for that and what do do other municipalities do that as well? Thank you, Miss Lockhart. Uh, thank you through the mayor to, uh, councelor Helm. That's, uh, part of the sewer utility report. Um, I mean, I can answer the question right now if that's, uh, that's fine. So, the $1.6 million was moved to the, uh, property tax notice in 2023, and one of the reasons for that was people are allowed to defer their property taxes um, through the province. And so by putting that on the property tax notice, it actually provides a bit of a break to the rateayers and uh if it's on the sewer utility bill, then that's not something that they can they can defer. So thank you. Please go ahead, councelor.
Thank you. I'm sorry for getting to the wrong one, but thank you for your help on that. It's all good. Certainly we're sort of not connected, but they're they're related. So, uh, I then I'll go now online to councelor Braithweight. Thanks so much, Mayor. And just a comment on the deferment. I think that with the last provincial government, maybe deferring is not such an a great thing anymore, so maybe it isn't helping anybody. Um, I do have a question on what the current balance of uh in the water utility capital works reserve is right now. I'm just hoping that we're contributing enough to keep pace with the expected replacement costs of um of some of our water manes, etc.
Lucker. Thank you through the mayor to councelor Braithweight. Um I can confirm that the current balance in the water utility capital works reserve is projected to be $2.4 million at the end of 2026. Now that includes uh reserve contributions as well as current year financial commitments. And in terms of whether this is uh meeting our annual uh funding targets based on the 2021 um sustainable infrastructure replacement plan, I can confirm that it's not. Um in 2026, the annual contributions will be 1.6 million. And in 2027, provided that council approves this utility budget, they will be 1.5 1.79 million. and the 2021 sustainable infrastructure plan was uh indicating that we needed 1.9 million.
And I'd like to add that uh I mean that plan is is old and so one of the things that we need to do is come up with a more recent plan. So it is it is not meeting the uh annual requirements unfortunately and that's based on 2021 figures. Thank you. Thank you for that. Um, okay. That I guess that's something we're definitely going to have to be looking at. Um, and and can you tell me is the overall water consumption increasing or decreasing in Oak Bay? And what um contingency is built into the budget if the actual water purchases are higher than what we actually forecast through the mayor to councelor Braithweight. Um I can confirm that we do not have a contingency budget in place for um a situation where we may have uh under collections of water and to answer the first question I will refer to my colleague Steve in regards to the consumption. Welcome to the meeting Mr. Renick.
Thank you through the mayor to councelor Braithweight. Uh we do track our monthly and annual water consumption and it's been fairly consistent over the past five or six years. We tend to see slightly higher consumption when it's hotter um when we have hotter, drier summers, but on the whole our consumption has been very consistent. Thank you. Thank you so much. That's all my questions. Thank you, Councelor Braithweight. Councelor Moore. Yeah. Through the mayor. Just curious about uh does each municipality pay the same price for uh water? I guess a bulk water rate. Yeah. Through the mayor to councelor Moore. Yes, they do. That's correct. And I'm just looking at the cost drivers here, looking at the numbers. Um, salaries and benefits, that's gone up 16.5%. I'm just curious, that seems general um and vague, so I'm just curious about kind of what that looks like. Mhart.
Yep. Through the mayor to uh councelor Moore. So I can confirm that the collective agreements were settled um for 25 26 and 27 and those increases were 3.75% for 2025. Um for 2026 they were 3.25% and for 2027 they were 3.4%. And so when it comes to collective agreements, um generally what happens there is um we go through negotiation process and we try to keep in line with what other municipalities are are offering their union staff as well. And sorry um through the mayor that 16.5% shows that the increase in salaries and benefits is 16.5% of the total increase relative to last year. Are the salaries and benefits changed by 5.2%.
Thank you for that clarification, Mr. Renick. Uh, other questions? Uh, this is open for public input. So, welcome any members of the public who wish to address us. This is an item 8.1, the 2027 water utility rates bylaw. Uh, it's it's true online as well. So, if anybody who's online wishes to raise their hand in the Zoom app, we will take your comments or questions. Anybody in the audience here wish to address council on this item? Not a stampede of people running to the microphone. Uh and I don't see anybody online. So I will come back to this table. Um these are bylaws. Uh so the first uh piece would just be the recommendation of approving the rates and then the second one will do the readings. Go ahead, councelor Patterson.
Yes, Mayor. I'm happy to move uh the recommendations as put forward by by staff. I do recall that that certainly when we talked about the um our sustainable infrastructure, the water was one that was flagged as being a high risk and needing attention. So, I completely support what the staff have have presented and I will make the motion that council approve the consumption water rate of 488 per 100 cubic feet and the fixed charge water rate of 98 cents per day. Thank you. Is there a seconder? Move and seconded. Any other discussion? Not seeing any. I'll just make a quick comment here. The um um yeah, I was just I was watching a uh webinar on on sort of improvements on on various capital things and the challenges facing and uh someone out of Edmonton spent a lot of time on the Calgary water main break and and the impacts of that. There's absolutely no doubt that we have an obligation to provide clean, safe drinking water. Um, and all things being
equal. Um, it's really remarkable given the complexity of the underground infrastructure that uh even given the cost here that it can be done even with that amount of money sometimes um given it's well over 100 kilometers of pipes that have to be maintained and replaced. Uh anyway, with that uh I'm happy to call the question. All those in favor? Any opposed? Looking online? Not opposed. Um then can I get you council passion to read the bylaws? Yes, mayor. Pleased to do that. Uh that council give first and second reading to water rate bylaw number 3370 1981 amendment bylaw number 49852026. Moved and seconded. Thank you.
Discussion seeing any. All those in favor? Any opposed? None opposed. and third reading. No. Uh yes. And that council give third reading to water rate bylaw number 3370 1981 amendment bylaw number 4985 2026. Thank you. Seconded. Thank you. Any other we don't usually have discussion on third reading. Uh but I'll give a chance. Nope. All those in favor? Any opposed? None opposed. That will come back for consideration of adoption at the next council meeting which I think is scheduled for December 14th. We move now to item 8.2. This will be the same process. We'll get uh an introduction. We'll have a chance for questions. We'll invite the public for comment and then we'll come back to this table for direction. Miss Lockhart. Thank you.
This report seeks council's approval of the proposed 2027 sewer utility rates of $3.98 per unit for the municipal sewer charge and $8.60 per unit for the regional CRD sewer charge. The proposed 2027 budget includes an increase of $410,393 or 6.6 over 2026. 6.6% over 2026. The primary drivers are increased CRD wastewater treatment costs which account for just over half of the increase and continued investment reserves to support long-term replacement and renewal of sewer infrastructure. The budget also includes a new reserve contribution for future replacement of utility vehicles and equipment funded through the budget reallocations. Consistent with council's approved asset management strategy, reserve contributions continue to increase to support sustainable, renewable, and replacement of infrastructure. The 2027 budget includes an additional 154,000 in asset management reserve funding, representing 2.5% of prior year revenues. This contribution helps reduce reliance on future borrowing, significant rate increases, and one-time funding sources while maintaining service levels. Based on the proposed rates, the average residential customer can expect an increase of approximately
$92.40 per year, although actual impacts may vary based on consumption. The proposed rates will maintain current service levels, support ongoing operational requirements, ensure that the utility remains financially sustainable while meeting future infrastructure replacement needs. Staff recommend that council approve the proposed utility rates and give first, second, and third reading for to the bylaw amendment. And with that, Steve and myself are ready to take any questions that you have. Thank you. Thank you very much. Well, we've already had one question, so we're uh we're on to next questions. Um, any questions for staff on this report? Go ahead, councelor Wraithweight. Thanks. I have a couple of questions.
Um, please. My my first question is the same as what I asked for the water. Um, what's the current balance of our sewer utility capital works reserve? And if we know it, what's the forecasted replacement cost of the sewer infrastructure over the next 10 or 20 years? Please. And thank you, Miss Lockart. Thank you to the mayor to councelor Braithweight. Um so there's actually two uh sewer reserves. So confirming that the projected balances at the end of 2026 will be 3.4 million for the sanitary uh sewer capital works reserve as well as 3.6 million for the upland sewer separation uh reserve. And again that includes the 2026 contributions as well as uh current financial plan commitments. And uh can I please just ask you to repeat that other question about the capital?
Yeah, it was about um if we know what the forecasted replacement cost of the sewer infrastructure over the next 10 or 20 years would be. Okay, thank you. I uh I will get Steve Renick to help me up with that one. Thanks, Mr. Renick. Uh through the mayor to councelor Braithweight. The anticipated capital spend over the next 10 to 20 years is not known at this time. Um we are still undertaking a lot of prioritization and scoring work. Um so we could provide the number from the 2021 sustainable infrastructure replacement plan, but as my colleague noted before, those unit rates are getting quite stale and um there's a lot more prioritization work that needs to be done before we could really give a definitive answer.
Thank you very much. And mayor, if I may, I have one more question. Go ahead. Uh um I'm just wondering if you can clarify the relationship between this is from the report between the approximate um 1.6 million in CRD debt servicing costs transferred to taxation and then the 882,000 property tax contribution shown in the 2027 um sewer budget. And I'm asking because I I for me it's just not really clear whether the 892,000 is separate from the the 1.6 six million or whether there's an overlap um in how the costs are presented. Thank you, Miss Locker. Thank you to the mayor to councelor Braithweight. So, they are two separate uh items. Um so, as I mentioned earlier, the 1.6 million um was moved from the uh sewer utility bill to the property tax notice and uh is essentially part of the CRD requisition that's paid to the CRD every year. and the $800 uh,000 figure, $892,000 figure, um, is property taxes subsidizing the uh, sewer utility. And so at some point in time, there would
have had to have been um, approval by council to uh, to subsidize the the sewer utility by this amount. Thank you. Thank you very much. Thank you, Councelor Braithweight. Um, I don't see other hands, so I'm gonna invite the public. still have a chance to ask questions and comment. Any members of the public wish to talk to council about item 8.2? This is the municipal and regional sewer rates and sewer utility budget. Don't see a lot of hands online or anybody in the room here looking to speak to us on this. Not seeing any. I'll come back to this table then. Um I will just for clarification purposes I think for the benefit of new counselors and probably members of the public. Um there is a percentage of the water rate which helps fund sewer and that's what you're seeing here. Um just for a little bit of background um when the sewer treatment plant was done regionally um we all all jurisdictions took on a portion of the cost of that based on
assumed flow rates and Oak Bay is higher than its expected flow rate with the anticipation of between sewer separation and some improvements that we'll have less ini that that contributes like rainfall into that into that piece. Um, that being said, there's this, you know, obviously the water consumption impacts. The more you flow the water, the more it goes into the sewer. So, there's a direct correlation of the cost that Oak Bay pays with the water flow. And so, uh, with that uh, it made sense to apply some of the cost uh, a percentage of the of the total utilization goes towards uh, this cost to uh, to to fund the sewer. So just a little bit of history there on that one is to so some of it was done the the hard capital cost which there was you know close to a billion dollars was borrowed that funding is having to get paid that's a fixed cost and hence the part of the rationale in
addition to being able to defer was that because it was a fixed cost unrelated to to um utilization people can't change their behaviors and affect that dollar amount. uh it made sense to spread that even appropriately like we do property taxes but the ongoing costs are related to the our share of that relates to consumption and hence part of that coming on to the water consumption. We don't we don't meet our sewers which is probably a good thing because those would be hard to do. Um so there we go a little bit of background attached to to some of those pieces. Uh any other questions or discussion from council before I seek motions?
Okay. So I again, Council Patterson, you're in the room and I'll keep looking over at you. So why don't you go ahead and I'm happy to to make this recommendation. I've looked into sewer and water rates a lot either through the CRD or or through um what we needed to do in our infrastructure planning here. And I I agree with staff, those numbers are a bit stale ddated and we will have to um bring them up to speed. But I haven't heard that the cost of the lines are dropping at any rate. So, I'm happy to move the recommendation that council approve the municipal sewer rate of 398 per unit of water and the regional sewer rate be set at $860 per unit of water. Thank you. Moved. Is there a seconder?
Seconded. Thank you. Any other discussion? Seeing any, I'll call the question. All those in favor? Any opposed? Not opposed. And can you read read into record the uh yes bylaws? Uh that council give first and second reading to sewer used user charge bylaw number 4392 2008 amendment bylaw number 4984 2026. Thank you. Moved and seconded. Any discussion? This is where we debate is on second reading. Don't see any hands. I'm going to call the question. All those in favor? Any opposed? None opposed. And the last that council give third reading to sewer user charge bylaw number 4392 2008 amendment bylaw number 4984 2026 be read a third time.
Moved and seconded. Thank you. Uh there debate on third reading. All those in favor? Any opposed? None opposed. That too will come back to a future meeting I think December 14th for final adoption. and um making sure I've got my sort one more and this series 8.3 the 2027 solid waste fee bylaw and disposal budget. Miss Lockart, you again. Thank you. Last one. So, this report seeks council's approval for the proposed annual 2027 solid waste rate of $42.75 per collection unit, representing an increase of $15.35 annually, or approximately 3.96% over the 2026 rate. The proposed 2027 budget includes an increase of $85,394 or 3.8% over 2026. The primary cost drivers are finalized labor collective agreement increases and rising heartland landfill tipping fees. Staff have worked to minimize impacts on the rateayers whenever possible. Through budget reallocation, staff were able to establish reserve contributions for the future replacement of solid waste utility vehicles and equipment, support long-term financial sustainability, and reducing pressure for significant future rate increases. In addition, a
competitive procurement process for organics collection and processing services resulted in $33,464 in annual savings compared to the 2026 budget. These savings have been allocated to a contingency provision in the 2027 budget to help address potential cost escalations. Overall, the proposed rate maintains current service levels, supports ongoing operational requirements, and ensures sufficient funding is available for future capital replacement needs. The modest rate increase balances affordability with the need to ensure the utility remains financially sustainable and continues to provide reliable service to the OPE residents. Staff recommend that council approve the proposed rate and give first, second, and third readings to the bylaw amendment. And with that, Steve and I are ready to take any questions you have. Thank you.
Thank you very much. Are there questions for staff on this item? Don't see hands online or go ahead, councelor Patterson. Yes. Um I'm wondering if um uh through you mayor to staff that just talk about the transfer to vehicle and equipment reserves um and it is that then our internal district um equipment Mr. Renick uh through the mayor. Yes. Thank you for giving me the opportunity to speak about this very uh near and dear to my heart. Historically, the district has charged ourselves rent on our fleet vehicles. So that includes the garbage trucks um in the solid waste utility and essentially that rent that we charge ourselves covers the operating expense of those vehicles and with a little bit left over to go into a machinery and equipment reserve to replace those vehicles. Upon a review, we realized that the downside of this is that if we have a bad year where there's fuel price escalation or um if we have a bad year on breakdowns
and require additional spending on consumables that essentially we we don't have that dedicated transfer to make sure that we're saving to replace the vehicles. The garbage trucks in particular are very expensive pieces of equipment. So, what we've done this year is we've actually changed that around in the budget. And you see it first in the utility budgets and um spoiler, you're going to see it again in the operating budget in the spring. Um we're actually creating dedicated transfers to reserve and then only having the internal rate cover the operating expense of the vehicles. Thank you for that clarification. And just I think just for public's interest in councils uh the solid waste is for the these fees cover the garbage collection and the organics collection but not the rec the CRD recycling. Is that correct?
Uh through to the mayor. Yes, that is correct. In British Columbia, curbside recycling is funded by recycle BC which is paid for by the companies who produce the recyclable material. So that's collected for residents by the CRD at no charge to the residents because it's paid for by the producers. Thank you for that clarification. Uh go ahead, Councelor Brieweight. Thanks very much, Mayor. Um yeah, I'm wondering about um the billable collection collection units there are, how many there are um and where and how they're determined. um why the number of collection units is higher than the number of households cuz that was kind of a little bit confusing and then are multif family property, secondary suites and other residential arrangements treated differently. Um just looking at for clarification because the fee um is described as being charged per collection and unit, not per household unit, I think.
Sure, Mr. Renick. through the mayor. The way that our bylaw defines a collection unit is essentially as a self-contained dwelling. Um it's not going to read the full bylaw, but if you have a house that has a secondary suite, under the bylaw, that actually qualifies as two separate collection units and thus pays two separate solid waste fees. Also, under the bylaw, we only collect ref use from addresses that have a maximum of 12 collection units. Um, which is a practical limit on how much we have the ability to collect. So, apartment buildings don't pay the solid waste fee because we don't collect their solid waste. They are required to make arrangements with private um third party haulers. So, this program essentially is for small businesses um and smallcale residences. So multif family up to 12 units per address.
Thank you. Thank you. That's makes a lot of sense. Um and then um have we considered different part sizes or other fee structures that would provide an incentive for households to reduce their waste? Because I know I think in Sandwich they have much smaller um containers than what we do. Mr. Renick through the mayor. Um, if we were to rate the most common questions that uh we receive at public works, may I have a different bin size would probably be number one. Um, we are anticipating bringing to council a report in 2027 to look at some options around uh doing a jurisdictional scan of what sizes are out there. We also have a challenge that the standard size of bin that Oak Bay provides our residents, uh, we actually picked a really weird size that not a lot of other people, yeah, not a lot of our other peers in the region use the same size of garbage bins that we do.
So, that makes it challenging to get our hands on them. Ultimately, um, there are a few hurdles that we would have to go through to allow choice of bin sizes. There's figuring out how do you equitably uh charge revenues because do you you don't want to create a model where everyone just opts into the biggest bin because it's not significantly more expensive. Um but there would certainly be a lot of advantages. We would also like to get away from having the retail tickets where people go to municipal hall front counter and buy those orange tickets for 75 cents per ticket. uh if we had flexible bin sizes, that's another operation that we could get out of because it's kind of an administratively inefficient way to to run the operation, right?
Thank you. Thank you. That's really informative. Thank you. Thank you. Uh I'm going to go to the public at this point. Any questions or comments on this item, which is our solid waste fee bylaw and solid waste disposal budget? I don't see hands online or anybody in the room running to the microphone again. So, we will come back to this table. Um, Council Patterson, do you want to continue your duties? Yes, I'm happy to uh move the recommendation that council approve the solid waste services rate of $42.75 per collection unit. Thank you. Is there a seconder? Move and seconded. Any further discussion? All right. All those in favor? Any opposed? None opposed. Uh, if anybody's opposed online, please just speak up.
Uh, I will try and keep an eye out for hands, but I may miss it. Uh, and then go ahead, councelor Patterson. Yes. That council give first and second reading to refuge collection and disposal bylaw number 4371 2007, amendment bylaw number 4983 2026. You is there a seconder? Thank you. Move and seconded. Any further discussion on the bylaw amendments? Seeing none, all those in favor? Any opposed? And third reading. Yes. That council give third reading to refuge collection and disposal bylaw number 4371 2007. Amendment bylaw number 4983 2026.
Microphone is off. Um item number 8.4 Before we move to land use items uh first one is 945 Running Me Place we have a development variance application uh here with uh and I will give this over to Mr. Ktois is the Yes, welcome. Thank you mayor. The district has received an application for a development variance permit for the property located at 945 Runny Place to facilitate the addition of a secondary suite to the existing house on the property constructed in 1957. A development variance permit is required to accommodate the proposed addition as it will increase the lot coverage over the maximum permitted of 30% for a 1 to2 dwelling units in the R5 zone. The proposal would increase the permissible lot coverage from 30% to 36%. Staff note that the requested increase increases to lot coverage limits are in line with those granted to properties when building an accessory dwelling unit and retaining an existing dwelling unit on the property. No additional variances are being requested to accommodate the proposed development of an attached secondary suite. The proposed development is not anticipated
to result in removal of any bylaw protected trees. However, the R5 do R5 zone lot does not currently meet the tree canopy target of 35%. At the time of building permit, the applicant will need to provide an additional 25% of tree canopy to meet the tree canopy target. Overall, staff find the proposal to be in alignment in alignment with the OCP goals and policies and therefore is supportable. The applicant also submitted several letters of uh from neighbors that are supportive of the development. Staff as well as the homeowner Karen Bus and architect Carolyn Wilson are in attendance today to answer any questions mayor or council may have. Thank you.
Uh thank you very much Mr. Ktois. is there. Our general process on these is uh valance permits allow for public input. We even provide a notification process for that. Uh generally speaking, we will take questions from council at this table. So there may or may not be some for the for the applicant. I'll call them forward if there are. Um after the questions, we'll go to the public for any additional for any input. uh comments or questions are welcome and then we'll come back to this table at the conclusion of the public input and we'll uh consider direction uh at this table. So starting us off I will go for questions from members of council. Go ahead councelor Patterson.
Yes. Um, thank you, mayor, and through you to staff. And I don't know who's best to answer this, but I noticed on the the the report it said there was a recommendation that districts should consider providing boulevard plantings towards the on-site canopy requirement. I'm just wondering if we could clarify the rationale for that. Mr. KTO, you can give it to Mr. Green if you wish. Yes. Thank you. Thank you, Mr. Mayor. and through the mayor. Um that has been a recommendation from the applicant and at the time of building permit uh we will work with the parks department as well as the applicant um as typically we do not permit uh the planting of trees on on the boulevard to reach that tree canopy target unless sorry it just took unless there was there there was a provision in the bylaw that talks about if the there's a physical or topographical issue with the site then the parks department could either accept cash loop or alternative locations about replacement trees.
Thank you. Thank you. Thank you, Councelor Patterson. Councelor Brieweight. Uh thanks so much, Mayor. Um yeah, I'm wondering if the um site servicing plan has has now been completed and if it has, has the project um arburist reviewed it and confirmed that it won't compromise proposed for retention? Please. Sure, Mr. Green. Uh through your worship to council breath. Uh obviously this is a development variance permit. We generally don't require a site servicing plan to be submitted as part of the DVP for particularly for such a a small project like this. It's it's likely that the servicing for a secondary suite will be using the existing services that that to that location. However, building permit stage that building permit would be referred to engineering and engineering would confirm if there was any additional servicing or uh upgrades required as part of that building permit process. Okay.
Um, yeah, thank you, mayor. Um, and then I I'm wondering, um, the parks memo um requires eight replacement trees while the arburous reports identifies 10. So, I'm wondering which um which the which one the applicant will have to adhere to. Mr. through your worship to council braith. I think council braithway is referring to the application for 3260 upland place that requires eight trees where this is 945 rene am I on the wrong one? I think so. We're at 8.4 which is 945. Oh, I'm on I'm on the wrong one. I'm so sorry. It's okay. If you want to go move on to someone else, I'll find my notes on that this one. Thank you. Yeah, no worries. Go ahead, councelor Moore. Yeah, through the mayor to Mr. Green.
I'm just curious when people come forward to um apply for a building permit, do they understand it's a 30% footprint in terms of what they build on. Go ahead, Mr. Green. Uh through your worship to council model. Obviously, applicants are generally aware of our requirements, but sometimes they have particular requirements why they can't meet that requirement. And in this case, there is an ability in the legislation for an applicant to submit a development variance permit to vary that provision of the zoning bylaw. And obviously then that triggers notification. It also triggers a requirement for them this report to to come to council to make a decision on whether to approve, deny or modify that permit.
You councelor Brie, did you have any questions on this one? I'm happy to jump in with a question if if Oh, go ahead. Please go ahead. Yeah, thanks. It would be around um trees as well. And I just want to see if staff can confirm that the tree canopy requirements will be enforced through the building permit process because I know that it's less. I think it's we're supposed to achieve 35% and I think that this is only achieving 16 to 20%. Um yeah, so I'm just wondering if that's going to how that's going to be enforced. Mr. uh through your worship to council braith. So our tree protection bylaw is essentially triggered at building permit stage. So at building permit stage when the applicant submits a building permit that building permit would be referred to parks uh and the parks department will ensure that that tree protection bylaw is being met in relation to protection of existing trees and also ensuring that the property is brought up to compliance in relation to the tree canopy targets that are essentially
written into that tree protection by law per each type of zone. Thank you. And then I I guess one other question around the um wondering if Andrew has confirmed that um that the proposed draining ar drainage arrangements will manage runoff appropriately and won't affect the um the houses around it. Please Mr. uh through your worship. Again, that would be addressed at building permit stage, but we don't believe that um this uh small increase in lock coverage would have any downstream effects. But acknowledging that that building permit stage, the applicant will need to ensure that the uh development ties into the necessary servicing including uh the storm drain that's located adjacent to the property.
Yeah. Thank you. Um, just for my clarification, it's hard to tell from the from the designs. I just want to get clarification. Looks like this is primarily a single family home with a with a little bit of a second story, a little bit of upstairs. Is that is is my read of the architectural drawings correct on this? Uh, to you, mayor. It is a single singlestory home that is quite tall for a singlestory home. Um therefore it doesn't qualify for the 35% lot coverage that is afforded to uh singlestory homes as we quantify that by height and not the actual number of stories. Okay, thank you for that clarification. Yeah, I was looking at this thinking it's a uh it almost doesn't need a variance because it really is appears to be a singlestory home, but I I understand the the technical reason why that would not qualify in this case. Okay, appreciate that. Um, don't see other questions from members of council. So, I'll open this up for members of the public. This is anybody wishing to address us on 945 Running Me, please.
And I'll look online as well. Quiet is usually we have a few people around for a few of these things, but it's quiet as late I think I've seen in a long time. All right, come back to this table. Uh, we have a recommendation here in front of us. I'm happy to speak. Move staff recommendation. Um, we we'll take a motion on the floor and then we'll take comments. So, move and seconded. Thank you. So, um, we tend to as a policy move, we don't have to, but we tend to move for the recommendation and we can debate it and we can decline it or what have you. Go ahead, council member.
Yeah, I just wanted to through the mayor just appreciate the public consultation that this applicant took to um, talk to their neighbors about what was happening. So, I just want to acknowledge that. Thank you very much. Other discussion see a lot here. Um just speaking briefly in in favor of the ask here. I do think you know recognizing this is essentially a single family home which is entitled to 35% uh and has uh I think obviously improve done a nice job of architectural design as part of their of their design pieces. Um uh and certainly I think uh when we were anticipating the additional percentage for ADUs, I think in many ways we're contemplating the same allowance for secondary suites. So I I think this really does align with the the intention of our zoning and bylaws.
So I think that the um uh I think for me it's it's it's quite supportable and I haven't heard loud voices of opposition at this point in the table, but uh uh go ahead councelor Green. Thank you. Yes. I just wanted through you to acknowledge the preservation of the small home and to the improvements rather than um you know demolishing the home that often happens when improvements are are sought after or new home is wanting to be built. So I I really appreciate the owner's effort and her contractor as well and architect to make this um a very livable house. Thank you. Okay. Uh if there's no debate, I'm happy to call the question. All those in favor? Any opposed?
None opposed. Uh that carries. Good luck with the project for 945 Renemade. Um we do a quick detour now for municipal ticket information bylaw. This is an amendment bylaw 4989. Uh Miss Anderson, you wish to give a brief introduction. This is a relatively, I think, straightforward piece, but we'll see how it goes. Go ahead. Uh thank you, Mayor. Good evening, council. The amendment bylaw before you was prepared in collaboration with department heads who identified the need to update the persons who are authorized to issue municipal tickets in the district to align with current district operations job titles and authorities under other legislation. The inclusion of the department directors and deputies in the schedule is to further ensure coverage of designated people during staff vacancies and absences. This amendment bylaw does not amend any other section or schedule or affect any of the fines outlined in the MTI bylaw. The recommendation is for council to give introductory readings to the bylaw as written.
Thank you for that. Um, other questions for staff on this item. Just looking online. I'll give a chance not seeing any hands popping up right away. I'll just give an opportunity for the public to weigh in on the municipal ticket information bylaw proposed changes which as noted are more administrative than than substantial. Seeing no me is for the public wishing to speak. Uh any other members of council that uh have questions before I get to mo to move moving the recommendation. Okay. I don't need to over rely on you councelor Patterson but uh you're handy. Happy to move the recommendation that council give first and second reading to municipal ticket information bylaw number 4946 2023 amendment bylaw number 4989 2026 Miss Anderson has her oh Miss Anderson please yes my apologies the version the citation that um councelor Patterson referenced there was just an error that we did update in republication so read into the record the bylaw receiving readings is the municipal ticket information by number 4846.
We can just make that note in the in the thing. So, uh, okay. Any other discussion? All those in favor? Any opposed? None opposed. Third reading. Yes. That council give third reading to municipal ticket information bylaw number 4846 2023 amendment bylaw number 4989 2026. Second. Thank you. Yeah. All those in favor? Any opposed? None opposed. Again, that comes back for adoption at a future meeting. And moving on then to uh bylaws and permits. uh these are this section is is not subject to public input although the upper terrace road does have some aspects which are uh open for public input so I'll I'll walk uh people through those pieces uh up first is an upland sighting and design for 3260 Upland's police you're back again welcome thank you mayor the district has received an application for an upland sighting and design permit for the property located at 3260 Upland's place to allow the sighting and construction of a new 635 meter single family home with an attached garage. The subject property is located at the end of of the
Upland's Place Culdeac near the intersection of Upland's Road and Cotzwood Quattzwood Road and nearby Upland's Golf Course. Staff review of the applications finds that the design conforms to the district's upland sighting, Upland's design guidelines, which has the intent of maintaining and reinforcing the residential park-like setting of the Uplands, ensuring that new development is sensitive to existing dwellings and landscape features while promoting design excellence and is therefore supportable. The proposed development would require the removal of five Gary Oak trees to accommodate the new single family home and driveway area. The district's parks department has reviewed the proposal and has accepted the findings of the applicant certified arborist including the requirement of tree protection and mitigation measures to be taken during excavation and construction. The application was presented to the advisory design panel on September 8th, 2026, who recommended the application be approved. Staff are available for questions, as well as the applicant from from Hoy Design's company is virtually in attendance today to answer any questions may our council may have.
Very good. Thank you very much. I probably will be some questions for u the applicant. Um so, uh this is not subject to public input. It's just a setting and design, not a variance or anything. Um, so really questions from councils for for the applicant or for staff are welcome at this time. Go ahead, councelor Patterson. And then I think councelor Braithweight had some questions directed at this as well. Go ahead. Yes. Thank you, mayor, and uh through you for staff. Just wondering if consideration was given in the um uh motor court area, I guess, is what it's shown. There are two Gary Oaks that are are kind of more at the souththeastern perimeter of that motor court, I guess.
And I'm just wondering if uh any consideration was being given to um to actually retaining those trees. Sure. I see um Matt Mousa on online here. Uh is I'll happy to direct that to you and if it's not you then perhaps uh you can give it to somebody else in the in the team. Mr. MOSA. Good evening, uh, members of council. Um, to answer that question, we our intent, um, to follow the guidelines of hiding our driveway, um, away from the public view. um as well as providing an adequate width of driveway um didn't allow us to squeak through those trees in a form that would allow us to provide um adequate turnout um as well as access into the property. Um noting that um one of those trees is technically still within the building setback. Um and we did do our best to retain trees that were around the perimeter um as well as that central tree um to get into the property.
Thank you, Councelor Patterson. Councelor Brie, did you have questions on this application? I thought you had some reference. Yeah, thank you so much, Mayor. I was a little bit ahead of my time last time. Um, so I'll go back to my original question that I asked for this uh um when I asked it inadvertently on the last um application um about the site servicing plan has and wondering if it's been completed and if so, has the project arburous reviewed it and confirmed that it will not compromise the trees proposed for retention? Please. Thank you, Council Braith. I'll give that over to staff. Go ahead, Mr. Yeah, Mr.
Thank you, councel, and through the mayor. Um, the site servicing plan has not been completed. This is likely due to the district's only requiring uh one at the time of building permit. Um, however, we can work with parks and engineering and the engineering department to mitigate any potential negative consequences to the the tree retention on the property. Go ahead. Thank you. And if I if I can mayor because the reason I asked that question was because I I would I would want the servicing plan reviewed by the project arbur I think before the district proceeds with the necessary pre-approvals because I I wouldn't want to approve the design on the assumption that the trees can be retained only discover only to discover later that the servicing makes the removal necessary. I mean I I and maybe I'm wrong on that but um that seems to me that that's something that we might want to wait for. Mr. Green.
Yeah. Through your worship to council braithweight. So obviously if C council is essentially reviewing a form and character design permit and so if council approves this permit this evening, then the applicant will be able to apply for a building permit as part of that building permit, they'll need to get their necessary servicing uh plumbing permits in relation to any connections to the existing infrastructure in Upland's place. And as part of that review, the project the district's project arborist reviews all building permits and then would uh issue any tree any necessary tree permits at that stage as part of that building permit. That could include tree uh tree purpose in relation to any protected trees that are needed to be reviewed now for the footprints as well as uh also working with the the applicants arburist in relation to servicing connection to minimize the impact of any new services that may need to be needed to be implemented from uplands place to the location of the the new house and I may just extend that question to
Mr. Mous since he's here, right? Do you anticipate any issues with the uh with the servicing um impacting any of the remaining trees on the property? No, we don't uh anticipate any issues. Um we do show a couple of connections currently for the sanitary water. Um however, if new connections are proposed, um there's ample room that comes up through the existing driveway between all the trees um that goes directly to the house. So um I think there's opportunity to um provide those services without any impact to the trees. Thank you. Go ahead, councelor Braithwe. Thanks. Um and then the other question that I had on this was um that the parks memo requires um eight replacement trees while the arburous report identifies 10.
So I'm wondering which one where what's the requirement for the applicant Mr. uh through your worship terms to break. I believe that that is a typo because it should be 10 replacement trees because our tree protection bylaw generally works on assumption where in relation to a a building permit in relation to a new driveway or building requires two two to one replacement and so I believe that is a typo and we'll follow with the uh arist to ensure that is the case. Okay. Thank you. because I did send a note um earlier today and there was a couple of other things like for example this on the staff report it it identifies it as section 31 whereas on the permit it identifies it as um section 21 um and there's a few issues with floor area I did send those those figures um to staff earlier today um so I'm wondering especially for the land though I think it's important that we we we say that it's is is it section 31 or is it section 21 and we should have that
correct Correct. I think through your worship to council bra. Yes. The legal description should be lot 3 section 31. We've made a note on the permit to correct that. My colleague Mr. Kto can comment on the floor area discrepancy between the architect's plans and the district's review of those plans. Thank you Mr. Kto. Thank you councelor and through the mayor. Um it's it's very common for applicants and staff measurements to not be exactly the same especially for the F measurements um given the in intricacies of our zoning bylaw and way and the way some of our um spaces are defined for the purposes of calculating floor area.
Uh the primary the primary reason in this case uh for the approximate 20 square meter discrepancies between the applicant and staff measurements um are mainly due to the first floor measurements and uh a patio that wasn't included on the applicant site plan. uh the applicant is using some specific very specific exemptions in our zoning bylaw that permits the exclusion of some wall space um to be to be excluded from the floor area. Um which that wall space is used to obtain better insulation um which is difficult to measure sometimes on the first floor. Uh and on that first floor in some cases uh the floor area um didn't qualify for that exemption and then staff measurements of the patio were approximately 43 m which is 16 square meters more than the identified area on the site plan. Uh it was measured as such uh because of the overhang of the roof which met qualifications for a patio instead of um rather than a roof overhang projection.
Thank you very much. Thank you, councelor Braithweight. Um, go ahead, councelor Moore, and then councelor Helm. This might be directed more at staff, but through the mayor. I'm just curious, who decides what trees are planted after the fact? Is that the developer and the owner of the house or do we determine what trees are planted? Sure, Mr. Green. Yeah, that would generally be our parks department, our arborist working with the applicants arborist. And so through that discussion uh obviously we do have a list of replacement trees that in our tree protection by law as what classified as replacement trees but generally our arborist requiring certain species. So Jennifer's Gary it will be replaced with the Gary oak. uh but in other cases as you'll see in the next application that both arburists agreed that Gary Oaks might not be the better replacement uh tree species to be planted but generally it's a discussion between the district's arborist and the project's arberist to determine what that replacement species may uh be more suitable for the particular site
just to clarify be native species yeah um that that is a question that because not all our trees I believe native species. I think it depends on how we're defining native species, but the list of trees that we consider for replacement trees are all listed in our tree protection by can't confirm if all those trees listed are actually considered to be native species. Thank you. And and just for further clarification on that, um the trees that count towards the the canopy cover definitely do not have to be native trees. It really just comes into the replacement portion of the bylaw where we we start working on those pieces. I councelor Hel.
Thank you, Mayor. Uh, as reluctant as I am to expose my ignorance, I'm going to anyway uh through you, mayor. I'm just looking at appendix A to the parks report and specifically trees 470 and 471 which are described as likely significantly impacted by the construction etc. And when I look at the site plan, it looks like those trees are at least outside of the building um envelope. So on what looks to be a side driveway? Um but when I see that they're likely um you know I take that well that's 51%. Do we have to take them down? Thank you. Over to go ahead Mr. Green. I'll um try and answer that question. Obviously the parks memo was basically saying that yes those two trees will be impacted by the construction of building. I don't know whether obviously there will be two portions of that tree. There is obviously the tree above ground uh that may be intacted in terms of its canopy coverage as well as below ground the critical root zone may be impacted by
the foundation of the building as well as obviously is needed to be removed for that driveway. Obviously if council wanted to try and protect those trees or save those trees then yeah council there was obviously an option in the staff report option two that talks about uh working the staff to work with the applicant to uh reduce uh the number of trees being lost or something to that effect and you would yeah then you pass a motion to that effect and staff would then work with applicant to see if it is possible to save further trees that are not necessarily directly impacted by the proposed building but are impacted by the proposed driveway and um and side.
Yeah, I don't know whether they arrest our project arborist reviewed. I can't remember what uh what health status there does to specific trees numbers 470 and 471 uh in terms of u the the applicant's tree management plan whether they are in good health or poor health. Um but yes, that's obviously within the perview of council. the council wish to see a revised design that could protect mutteries, then that is obviously an option that's outlined in in staff's report to uh to that effect. Thank you. I I like always like giving the opportunity for applicants to be able to answer the question of the why. Uh so, Mr. Ma, I'm going to give it to you. There's there's probably two trees.
The fourth is the 470 which is pretty close to the building but number 471 which is beside the house and and closest to the edge of the driveway and also 464 which is again just slightly inside the driveway on the way in. Can you maybe just uh explain to us the rationale for you know not working around those trees and and and just uh allowing the the pave surface to to require their removal. Um yeah, I'll start with 471. 471 was actually not required um for removal based on the the paving. Um it actually does have a critical root zone that's fairly large and is impacted by the um structure. So, it was um noted as being removed quite early on and and the applicant then or sorry, the homeowner um requested that additional paving on the side um knowing that that tree was already going to be removed. Um, and as for 464, um, the I guess the the size of the motor court, um, is mainly based on getting access in and out of the garage.
Um, it's noted that the street itself, uh, Upland's place is quite small. The neighbor has a roundabout driveway with two access points limiting um any parking that might be available on the street um and really didn't want to provide that opportunity as well. So with this growing family um providing that on-site um parking was um favorable over top of potentially crowding up the street. Okay, thank you for the explanations as to the as to the why. Um, other questions from members of council? I don't see any. This is not subject to public input. So, I'm going to suggest that somebody put the motion for approval on here. We can give we can debate that and again we can give direction back to the other pieces, but easy to talk. Motion to approve. So, motion made. Is there a seconder?
discussion. Sure. Go ahead. C council green. Thank you. Um discussion around this table. I see a couple hesitant hands on the approval. So um councelor Patterson, do you wish to speak first? I think that uh I think that the staff have given good rationale for for the decisions. I I I don't like the tree loss as I suspect most people around the table uh don't like the uh the tree loss and um it's contributing to um the park-like atmosphere, but I think it is um a quality development put forward and and I will I don't I agree with staff's recommendation. Okay. Thank you. Uh, there further discussion. Um, yeah, I I'll speak briefly to this.
I was just trying to find the uh the details on the 464, but I'll leave it. I, you know, at the most part on these things, I when I first looked at the plans, I thought, you know, uh, maintenance of the existing driveway made sense to me and and that would allow for for uh uh, you know, uh, retention of of a couple of more trees. Um, that being said, I think if I look at the lo of the design of the house and the location on the lot, it actually makes a certain amount of sense to minimize the net amount of trees being lost. Um, and I will just essentially trust in the in the work of the arborist and the and the applicant as they've gone through the process of of and thank you Mr. Mousa for the explanation. Um, I considered those those two trees being pieced, but I see some both in a condition basis and on a location basis.
I understand the rationale and as long as they're being replaced on a particularly where there's a 2:1 ratio, I think it's fair uh to see some some replanting of trees uh on the site. So overall, pending hearing from members of council, I feel like the application has has sufficient merit to proceed. I don't see other hands. Okay, I'm uh we have a motion on the floor, so I'm going to call the question. Uh all those in favor? Any opposed? None opposed. That carries. Uh good luck with the project to the applicants. I understand uh Lim Carson the order and then to uh Mr. Mouser who's joined us here this evening. Good luck with the project as it goes forward. Thank you very much. Thank you. Good evening.
We move next to item 9.2 which is 3470 Upper Terrace Road. This is both an upland sighting and design and a development variance permit application. We have Miss Claver here to uh to walk us through this. I will note that um while the sighting and design is not up for public input, uh the ask for relaxation of the of the sideyard uh is variance and that is open for public uh discussion. So um over to you Miss Claver. That is correct. Uh good evening mayor and council. I am presenting an application uh as noticed for an upland sighting design permit and a concurrent development variance permit at 3470 Upper Terrace Road. Um the owners seek to construct a new singlestory um accessory dwelling unit at approximately 1,400 square ft uh which includes an attached twocar garage. Uh it's going to be proposed sighting in the northwest rear corner of the property. Um uh as referenced, the the lot is zoned R2 um and is in the Uplands
um neighborhood. Uh the principal dwelling um is currently under renovations and so there's been staged development on site. The ADU or the accessory dwelling unit is intended to support multi-generational living. It's designed to match the architectural character of the principal dwelling which includes the materials and colors of the house and is cited uh relatively subordinate to the design and and uh the size of the current residence. Um and the the sighting is was proposed as to also screen um the ADU from the street to to uh be in conjunction with the uplands sighting design guidelines and enhancing or maintaining that park-like atmosphere. Um there is significant mature trees covering the property uh including a stand of Gary Oaks. Um, as we know, the OCP uh does uh look at supporting um ADUs uh as well as reinforcing a uh a residential park setting in the Uplands neighborhood. So, when it comes to the variance uh being requested, um we are looking at the north northern interior lot setback. So
the requirement um for this zone, the R2 zone is based off of the lot breadth uh which is 4.6 m. Um the the proponent is requesting a reduction of 2.62 m to reduce it to just under 2 m. So 1.98 m. Um and we have that design that set out in the report. Ultimately the reduced setback is driven by the desire sorry to retain as many healthy mature trees as possible. Um however there are uh two requested uh gary oaks that um do get impacted by the sighting of the construction. So that's noted in the report. Uh we have worked with the parks department quite extensively. Uh we had a pretty robust site visit uh including the project team um landscape designer their project arborist parks department as well as planning staff to work through all the different variables uh that are being considered. Um ultimately we have uh a tree protection plan um as well as landscape plan that's been included and reviewed by the parks department. Um and although there's some constraints uh on
site uh and trees being proposed to be removed, uh the parks department has supported what is uh being proposed in in the report. So ultimately because um staff, you know, we're looking at many different uh components here with uh a new ADU that's being proposed that is uh that does meet zoning. Um we are just with when it comes to relaxation and also taking in consideration the upland sighting design guidelines as well as the very thorough evaluation by staff including the parks department. Um ultimately staff feel that uh that the guidelines have been met um and that are recommending approval um for both the upland sighting design permit and the variance. Um we do have the property owner, designer, landscape architect um and I believe the arborist present to answer any questions as well as um I'm happy to do so as well. Thank you.
Thank you very much uh for that. We uh come over to this table. I'm sure there's a few questions for members of council and after we get questions here, I'll go and uh see if there's any questions or comments from the public on the variance portion of this. Members of council, any questions? Councelor Brieweight. Um, thanks so much, Mayor. Mine are my questions are really all around the trees, I think. Um, so, uh, the applicants proposes 10 replacement trees, and I'm just wanting staff to confirm that all 10 are shown on the landscape plan because I'm not sure that I actually saw that. um and um confirm that the planting complies with tree protection bylaw cuz I I did look on the plan but I don't I don't know if I saw exactly where they all were.
Thank you through the mayor to councelor Briweight. Um yes uh so it in attachment nine we have our draft permit. So I do apologize there's many different uh uh documents attached and reports but ultimately um embedded in that draft permit uh which you know staff in the district set out all the conditions that need to be met. Um we do have the design plans, the landscape plans, uh the tree protection plan, which also includes the replanting plan, and all of this was uh reviewed and uh by the parks department. And in the I believe it's attachment 10, the parks memo, uh it is laid out um essentially the the table of what's being proposed, what uh the tree protection bylaw speaks to in terms of tree canopy coverage as well as the number of trees that are requested to be removed. There is a 1 one and sometimes a 1:2 ratio depending if it's a diseased or non-d diseased tree. And ultimately um we do have some trees that are proposed on site and I and there are some that are proposed along the boulevard and that was discussed um
between the project team and the parks department and that was agreed upon. Okay. Thank you. Um and if I may um I there are also four offsite trees that um still have a retention status of to be determined I think in the report. Um, and I'm just wondering what further investigation is required and and what happens if those trees can't be retained through the mayor. Um, thank you for that question because that was something that has definitely been evaluated on on many levels. Yes, there are four off-site trees uh that are run essentially on the neighboring property at 3280 Upper Terrace Road. Um and because of the proposed sighting of the ADU and the um the the root coverage, you know, there's a diameter around and ultimately what is recommended of uh of keeping spatial separation from that route. Um so not to impact it but ultimately because of where the proposed ADU is uh is to be cited uh there is the potential and that is spoken in the tree
protection plan that those neighboring trees could see negative impact. Um and it will only be discovered at time of of groundwork. So the excavation when that actually starts. And so we work through that process with the project team and the parks department to determine um what sort of mitigation efforts can be made. And so working with the project arburist um there was recommendations of a uh of a lift of the um foundation and I will definitely happily defer to the project team to speak more in detail if they'd like but um ultimately also how the foundation is going to be poured that's going to have to be um you know funneled through from the street level versus trucks coming back and forth. Um but ultimately there still are unknowns uh and we we won't know until um ground work is started. So thank you council. Do you want to hear from the project team about their mitigation models or are you comfortable with that answer?
I think I'm comfortable with that answer. Um I I would have just an add-on to that to that question though. I mean I I must and this is basically for the new people sitting around the table. um when something like that happens to somebody else's property that's um that their their tree is their property is being affected by a building on their neighbor's property. Um can you just explain what the process is for that like um who ends up having to pay and uh and what the impact on that neighbor would be. Clever through the mayor. Um ultimately um you know this is something that we are trying to work through in advance as much as possible. Um but there there is a reality that if there is um you know in the tree protection plan it does say that if the trees need to be removed if that's it's deemed that there's enough negative impact those trees need to be removed they need to be um at the permission of the the trees the property owner where the trees are cited. um that is not in agreement at this point.
Uh so, you know, we're hopeful that those trees can be retained, but that ultimately is going to come down to the two property owners working through that negotiation and it is a civil matter. Um so that is the reality. Yeah, thank you. That's yeah, that's unfortunate. Um my my last question would be around um if the project arborist is is required to supervise. Uh oh no sorry um all right the because the the principal house is already undergoing the renovations and the other work is identified under separate permits. Does the arborist consider like the combined impact of all of the construction on on the trees or or is it separate?
Miss Cleaver through the mayor. Um ultimately the tree protection plan that was put together for this project did consider an earlier report that was done in 2024 that was prior to um any of the renovations. The current report that was revived specifically speaks to the addition of the ADU. It looks at the total tree uh canopy coverage. It looks at the total um health of all the trees. But the overall I think impacts to all the trees is just looking at this localized sighting of the actual proposed development of the ADU. Okay. Okay. Thank you so much. Thanks, Mayor. Thank you, Councelor Brieweight. Other questions for the applicant or to staff? I have a question for the applicant um and one for staff. So if someone from the development team wants to come forward, I'll uh it's just related to the mitigation meas measures uh for for the foundation related to the trees. Uh and to staff just a quick question. My reading of the of the uh the variance here is that the um the
most of the acceler accessory dwelling unit is actually compliant with the zoning. Uh it has a 4.6 meter. is really just the sort of front end of that where the garage is that that adjusts. So it's it's a windowless and relative and and not terribly long portion but it is that portion of the building that is non-compliant with the setbacks. Everything else is compliant. Is that correct through the to the mayor? That is correct. Yeah, it is this the the front um entrance garage area is really what bumps into that interior setback. Okay, great. So it's really that portion that we're concerned about the correct.
you will see um there is a side that it is compliant with the 4.6 m setback. Thank you for that clarification. You're welcome. To the applicants. Yeah, just curious about in that section I guess is the area of concern where it might impact neighboring trees. Have you just if you wouldn't mind sharing your thoughts about some potential mitigation factors so that those the neighbors trees are not impacted where the where the setback is being asked to be relaxed. Oh, I'll turn the may have to turn the button on on the microphone. I think it's uh Yeah, it's okay. Well, I think it will. No, the there's a button on the back that just needs to be pushed. There we go.
Well done, Mr. Green. Thank you. Um so, can you say your name for the record? Russ Collins. Thank you. Um the um project arborist wasn't able to make it tonight, but he wrote this short um letter for us to read out to you tonight. So it says to whom it may concern. Firstly, I Pete Macccara of Bartlett Tree Experts Limited, BTE, write this letter in place of my personal attendance for the council meeting with regards to the ADU application at 3470 Upper Terrace Road. The ADU placement has been carefully determined to minimize impacts to the surrounding trees as much as possible. Mike Evers from BTE and myself have been involved with this project from the onset, including multiple Zoom meetings, on-site discussions with the planners, landscape design, as well as the District of Oak Bay Parks and staff. The proposed sighting location is the best location available. Furthermore, additional design measures will be implemented if roots from the neighboring trees are encountered to minimize the impacts of them. This could
include a foundation grade beam, helico piles, or other measures if necessary. The goal is to maintain as many trees as possible and to ensure their long-term viability. We will continue to be involved in the project and provide arboricultural expertise. All on-site work within the critical root zones of the trees yet to be determined will be supervised by Bartlett and myself. Additionally, the six Gary oak trees number 828, 829, 830, 832, and 833, and 834 are all inoculated with the pathogen amalaria gelica. The secondary pathogen degrades roots and lower trunks of many species, making them structurally unstable. And regardless of the project trees, sorry, regardless of the project, these trees should be removed. Being a secondary pathogen also means that these trees will initially being impacted by a separate factor prior to the pathogen.
Kind regards, Pete Mccera. You also answered my question about the footings and so forth. So, thank you for that. Um, are there other questions for the applicant or to staff on this application? Now if I if I could it'll go to the public. Yep. Uh just since that since the applicant is there right now um yeah around the this the um variance that's being looked for um the neighbors that are on that side. Can can you perhaps talk to um if you've spoken to the neighbors on that side and what the impact of that would be what what the impact of that setback would be. Thank you.
Yes. Hi, my name is Jennifer Kuier and I'm uh the owner along with my husband of this property. Um yes, we have consulted with the neighbor to the north um on multiple occasions and we have worked to incorporate all of their feedback or any comments that they have had. Um you may have seen in our original submission that the roof pitch for the building was approximately 22 feet. Um and we have now reduced that to approximately 17 ft. We have also relocated any building access points so that there are no doors and very minimal windows to the north side of the building. Um we have also prioritize privacy in our proposed landscape plan. Thank you.
Thank you. Don't see any other questions for the applicant at this time. So I'm going to invite any members of the public who wish to speak to us about the application. This is specifically to the variant. So, this is the setback along the garage of the the north side of the building. Um, if people have concerns or support, you're more than welcome to speak. We don't have a big crowd in the audience today. So, limited number of people who have potentially come to speak, nobody's jumping up. I don't see names online. If you wish to speak to council, uh, you can do so. You just have to raise your hand within the Zoom application. Um, we have a couple of moments here as I wait, but I'm not seeing anything online. and I'll I'll if I see a hand raised I will come back to it but uh without seeing that I'm coming back to this table um so we have two separate portions as a sighting and they're really tied together obviously the sighting and design and the DVP um
so I don't mind just uh actually I can't anticipate we're going to get any additional feedback at this point I think we've had opportunity um so just turn to the table here that we have two different motions um so if someone wants to move the first portion we can then um speak to that either in favor or against. Um so we get a mover and a seconder of the recommendation. This is for upland setting and design not the variance. They are moved. Thank you. Is there a seconder for second? Thank you. Um so on the application and we can speak to both parts obviously because they're tied together. Um do does a move wish to speak?
I I'll just say that I really like the design and uh like the fact that uh it's minimal impact to the neighbors and you've tried your best to accommodate and also the I appreciate Bartlett Tre's memo because one of my questions it wasn't clear that all eight of the trees were diseased. I and so it's I mean I'm not happy to know that but I guess I am. Thank you. through through the mayor. Sorry if I may. Um that is not correct information. Not all eight of the trees are diseased. I think there were six that were listed. Correct. Correct. Six areas. Two are not.
Yes. So just wanted to put that on record. Thank you, Miss Claver. Go ahead. M councelor Helmet. You have anything? Thank you. I've obviously then been misunderstood because I saw in the um report that we have two are described as being within or adjacent to the ADU footprint and six diseased, but it it seemed unclear. And then when I heard what Bartlett said, I thought, "Oh, okay. They're all so I obviously got that wrong." Yes. 66 of them are Yeah. 825 and 8.26 are conditioned fair, but to be removed because of location. All right. Thank you. So, of the eight total, six of them are diseased. And that again was very intentional when we looked at the sighting for this to take advantage of that location of the cluster that are diseased. Thank you. Other discussion?
I'll speak very briefly just uh in support of the application. A very thoughtful design uh you know, sympathetic to the to the to the primary building. Um I don't I didn't like the setback at the beginning. I was looking at that thinking about you know surely there's a way of moving that. I understand the rationale seeing that with the other trees that would be impacted if that portion of the building were moved over. So um and really appreciate uh the answer to the question about the mitigation factors to make to minimize the chances of impacting the neighbors trees. certainly anticipate expect that to happen but overall um I think this is the kind of quality of design of ADUs and use of the site that we we generally hope for when we see these these pieces coming forward so um it feels very supportable at this point in hearing other people's points of view if they have other things I haven't seen go ahead council more if I may just again the thoroughess at which it was done I just appreciate that um it was very well done yeah
thank Thank you. Go ahead, Council Green. Yes, I really appreciate all the efforts that the applicant has made and her design team has made to mitigate those concerns. And I really trust and hope that the relationship with the Northern Neighbors um will evolve over time and and be positive. And I think that will be demonstrated once the once the buildings are up. I find that people have a hard time to visualize. they imagine something and you know once the building is built I think it's much more certain for them but I'm hoping that that will resolve. Thank you. Okay, councelor Patterson. Yes, I may as well since everyone else I you know it it's um it's very saddened to hear that there were so many trees that were impacted by disease that they have to be removed. And I mean it is a reminder to all of us that you know we if we're privileged to have trees on the site they really do need attention and care over over the long term and
certainly with the removal of all of those one the ones that are necessary to be removed and the others that um will be removed to accommodate the ADU which I agree does um uh meet very well with it harmonizes with the existing house and it is approved by the design panel also. But I do hope that all steps are taken to um to avoid any um any compromising of the trees on the adjacent property that we take that all steps are taken to protect them um in any way that can possibly be taken. Thank you. Thank you, Councelor Patterson. I'm going to call the Oh, go ahead, Councelor Briew. Uh, thanks. So, yeah, I I I would just agree with everybody. My my main concern was the requested setback variance um and its relationship to the loss of the eight Gary oak trees.
Um, but um I'm satisfied with the proposed uh tree protection measurements measures uh and especially for when I hear about the what will be done um to help mitigate those issues on the neighboring properties. Thank you. Thank you, councelor Braithweight. Um, so I'm going to call the question on the first part which is the approved sighting and design for 3470 up U upper Terrace Road. Uh, all those in favor? Any opposed? None opposed? And then can I have someone move the DVP? Go ahead. So this is the approval of development variance permit DVP 00198 for 3470 Upper Terrace Road. That's moved and seconded. Any further discussion?
Seeing none, all those in favor? Any opposed? None opposed? That carries. Um, thank you very much. And we move then to item that was 9.2. We now move to 9.3. Uh, we have the we had first, second, and third reading of the uh, King George terrace culde-sac renaming bylaw uh, at a previous meeting. So, it's back here for uh, adoption. Uh, this is our chance for sober second look. Um, but we don't usually have debate unless there's some something new information that's arisen. Um, so can I have someone read aloud the uh the motion that's in front of us? Go ahead, councelor Helm. Thank you. I'll move the recommendation uh that council adopt King George Terrace renaming bylaw number 4987 2026.
Thank you. Is there a second? Second. Thank you. Moved and seconded. Any discussion? Seeing none, all those in favor? Any opposed? None opposed. And I have a notice of motion. This is my notice of motion. So don't usually read notices of motion into the record, but I'm probably happy to do so at this point. Just uh you need a second or so. Basically, as laid out here, the council direct staff to undertake an expedited replacement process for the playground at Willows Park with a target reopening time frame of May 2027. Is there a seconder and move and seconded? Thank you, director or councelor Helm. Very brief motivation on this one. Um our usual replacement process for playgrounds involves often multiple uh series of consultation with the with the neighbors and the neighborhoods. Um uh and uh there's obviously this is twofold. one, it is a uh regional park is what has it does have local neighbors and we certainly want to encou encourage consultation with the public to make sure that we understand the kind of you know amenities and and and playground
structures that we want to see as a community. Um but there's also um a reality that we've had an unexpected closure here that I think deserves to have a an expedited process. uh this and as you can see it's undefined so it's very uh very very high level uh just to basically give staff permission. My understanding is if this passes there'll be a report coming back in January to kind of lay out what that might look like and get signed off from council. Um so um I intentionally left it general. Uh I didn't put an aspirational goal of May of next year which is not likely.
I'm going to say that, but I think if we can work towards that as an as an attempt, it might give some urgency to things like provincial permitting and and third party partners and so forth that obviously there is the the first weekend in June is the OPT party. It would be nice to have uh a new playground to show off at that that event, but uh again target is a is a loose term in this case. I have to recognize that just given the time frames that uh these playgrounds tend to have even just the lead time for ordering tends to be in the 9 to 12 month range as I understand it. So pretty hard to get back here and in 8 months with a with a fully built out piece but uh that's my motivation for the piece. Go ahead councelor Helm and then councelor Green.
Thank you. Uh am I correct in my understanding that parts of the playground are going to be opened imminently? Uh that is correct. Um so yeah we have Mr. Sulier has sat through the entire meeting patiently, so why not uh invite him to the to the to the microphone. Welcome, Mr. Sulier. Thank you, Mayor. Um, and yes, uh to C councelor Helm, um we have probably uh a few more days worth of work to uh to refurbish the uh pieces that we intend to retain on the short term. Um as well as add some additional gravel underneath some of those elements to ensure we have the uh the sufficient depth.
Yeah, thank you. And thank you to staff for the for finding a way to to remediate those to keep as much as we can operating. Go ahead, councelor Green. Thank you. Um and and I I completely understand the rationale for this notice of motion. Just a couple of questions or comments. One is the operational nature of the motion and and usually it's noses in and fingers out. So I just wondered if this was tilting to the operational side. Um and that was a concern. And then the other one was will this um ex expediting a project like this will this um have any impact on staff's capacity given all the other work that seems to be on on the on the books at the moment. So I just wanted to make sure that and and I again totally understand your rationale but I just want to ask those two questions. Thank you.
Mr. So your answer, but I'm going to answer my my part of it first in terms of the intention u which is that um correct we do not want to be directing operational pieces but we do have a standard policy that I think is the expectation and and that is uh you know I think important for staff to deviate from our sort of standard practices um would is going to probably require council approval and this is sort of to indicate that we're interested in that um to go forward. Um it also probably means uh looking at moving forward some of the financial pieces which are again are council purviews. Um but the how this is done I think is fingers out on this case from my perspective. Mr.
Shelier. Thank you. Thank you through the mayor. Perhaps I would just add that um staff were anticipating initiating a planning session or um planning project for uh Willows Park um in the coming year. um the specific um condition of the of the uh equipment that we have that we found through our inspection that that surprised us to a certain extent. Um so this has moved up on the priority list in terms of the uh staff workload work plan as well. Um but this this no doubt will be a very complex project and happy to report back in early in the new year with the details around uh what what it might look like in terms of doing this as expeditiously as possible. I appreciate that. Thank you so much.
Thank you. I have councelor Braithweight and then Patterson. Thanks so much, Mayor. Um, and since Mr. Sole is there right now, um, is it realistic to us to to consider that this could be done by by June 2027? Mr. to the air through the mayor. Uh we have been looking at uh options at a at an initial sort of preliminary level and um we've been extremely challenged to find a way that this could be um completed by this summer just given what we've um uncovered in terms of the conditions of the site and some of the challenges related to um what we're currently working with there and and the requirements from both from the province and uh Canadian safety standards. But um yes, that is a very challenging directive and and thank thank you for your honesty there. Um because I mean honestly for me, I want to make sure that that park I mean that's one of the most iconic places in our municipality and I want to make sure that that park um is is done
in a way that that represents that. And and I know that we talked um before about um you and I have talked about this the park at Squamish and what they did there and it's stunningly beautiful. I'm sure it took them a lot longer to plan it and it took a lot more money. And so the funding that's allocated for the replacement, I know we had funding already allocated for the replacement, but does expediting the project create any more additional costs? I'm I'm sure it must, but do we know yet if it's if it's going to um add any additional costs in in there for the project?
Good question, Mr. Sier. Through the mayor, and again, we're happy to lay out um some further details in the report back. Um if council gives us this direction, um there are additional costs that um we've identified that need to be added to the to the proposed budget. um expediting uh the process um would likely carry some additional costs, but I think it's too early to say precisely um what that variance would look like. At this point, we're looking at um sort of the the core requirements of the replacement and the adjacent landscaping that uh would be required likely. Um unfortunately, it's not as straightforward as um just replacing the existing equipment, uh bolting down new equipment in that site.
There are um additional factors related to compliance with the Heritage Conservation Act, for example, as well as accessibility through our playground replacement policy. There are some very um there there's a handful of guiding principles that we need to comply with um when we're replacing playgrounds. Um and and the current playground is absolutely not accessible and that will need to be addressed. Thank you for that. That's a very good point. I think that a lot of people think we should just get on with it and put a playground in there, but there's so many of these things that are that the public I think and we don't ever think of and that's why you guys get paid the big bucks because you know all those things. So, thank you.
Thank you, Councelor Braithweight. Councelor Patterson next. Yes. Thank you, Mayor. And um I guess I certainly appreciate the intent with which this is is brought forward since I pass it daily and the first day the fences went up I certainly heard about it and even though I didn't know anything about what was going on but um I I do agree with councelor Green too. I looked at this as being a little more operational than um governance and policy setting and and the reason for that is that um I think it reveals a weakness in the district's asset management program regarding fiscal responsibility and decision making. Um two parks were were planned to be done next I guess Lafayette Park and Willows Park. Um, so it it's not like it wasn't in the queue. It was in fact in the queue, but um uh we it we we just gave gave approval for some of the uh the uh parks master planning, parks and recck master planning. And I do appreciate also I
will add that I do understand director Sulier has um not been with us an extensive length of time to have to have reviewed all of the all of the great number of things from membership fees to um fees for uh rentals and just everything the gamut of this and and conditions of the buildings. But I get on this one, it is in a prominent place. I understand that. But this is one. And so I wonder if Lafayette or Firefighters Park or any of the others, have we done the conditions inspections to understand that this this would be the the the only ask that is out of the regular sequence?
Mr. Sier, it's to the mayor. Um yes, we we did um have an additional spec inspection completed on Lafayette Park, which is um the facility that we've identified for um replacement next. Um there were some relatively uh minor fixes that uh our staff attended to uh last week and I think maybe today we finished that up. Um that will allow us to um focus exclusively on Willows Park in the next year and then that would mean uh Lafayette would move a year out. Um but uh we do feel comfortable that that one is has sufficient time left in it to safely operate. Um the remainder of the playgrounds um are not that close to end of end end of life. They've all had inspections. We have a monthly inspection program that is happening. Um and we've introduced some additional um requirements for our operations team as well to be uh reviewing these uh facilities. Um, so we we do not expect to be encountering this type of situation uh again in the in the coming years.
Thank you. Go ahead, Council Moore. And then can just one more question just to confirm that the Willows playground um is one of the playgrounds that is located in an ecologically and environmentally sensitive area. Mr. Sus and and culturally sensitive. Yes. Thank you. So I guess just curious about kind of timeline in terms of what we share with the public could be
that um knew when I put it in there just as an aspirational goal that it's not likely to happen. I think what we will have back is if this passes, we'll get a report back in January that will lay out what the what the next plan would look like and that'll give us our options for ways that we might, you know, impact that decision. Um, so yeah, I think be cautious if this does pass, not to not to promise me. I think that's uh we have to be very aware of that. Um, it was there largely to say if there's any way we could do it before the Tea Party that would make sense, but recognizing it's a long shot to get there. Mr.
If I might just um let council know that our intention even prior to this um motion being discussed today was to have um some additional activation and programming happening in the park this coming summer. um knowing that even though we're retaining some of them the the pieces of equipment um short term um there is a there's a high demand in that park obviously and um so some of our our recreation programmers are looking at opportunities for some additional programming to to enhance the offering this coming summer. Very good. So councelor Hel, did you have your hand up? I didn't. Okay, councelor Patterson, back to you. If I can just add one other thing because I do hear about this pretty well every day, but of course the the um the uh the playground was taken out of service, but there were also at the uh at the south end off of Bowerer, there were also bicycle racks that were removed and they are used extensively by the people that go in the water first thing in the morning. The dippers.
The dippers. And so, uh, as well as, um, the, uh, the park part of this, is there also plans for the bicycle racks? Little off topic, but we'll allow it. Go ahead. My colleague, Mr. Renick, has is gone. So, I'll uh I'll speak on his behalf. I do believe that there are additional uh bike racks uh going in that space as well as some some general cleanup and rationalization of the of the space there to make it um uh cleaner, more aesthetically pleasing. the signage is being addressed um and the uh the ballards that were deficient are being replaced as well. So a general improvement to that area.
Thank you for that clarification. We do get these questions. So it's nice to have um so I don't see other hands so I'm happy to call the question. Um I I will say on this one I in and I really appreciate the comments made on this. I think this was uh this is in two parts. one to give a little bit of u uh directions we we can we we have the possibility of looking at ways of speeding this up and improving a process. Um, second, now that that this is a discussion with staff, probably not as necessary, but I think it does also just help signal to the public who are very interested that we are we hear them and that we are supporting a process that may not be as fast as people want, but at least as as fast as we can do and still meet all the goals of the of the ecology and the cultural sensitivity and all the permitting
requirements and so forth. So, um, that was that's sort of that's certainly the intent of this and certainly if it doesn't read that way, then I think that's appropriate not to support it, but that was certainly the the u the intention of this motion as it stands in front of us. Yeah, please go ahead, Council Moore. Just the communication should be ongoing as much as it can can be. You know, I know the signage and stuff, but just like updates, if we have updates, just be really good communication strategy. Yeah. Yeah. Mer, do you want to talk to that very briefly? If if it's helpful, I can assure council that a project web page will be posted on the connect oak bay site once we start.
Very good. Thank you so much. Okay, I'm going to call the question because it's getting late. Uh all those in favor. Any opposed? Not seeing any opposed. That carries. Uh looking forward to the report. I really appreciate uh staff's work so far on this. Uh Mr. Sully, I'm glad you're here. Um there was a a lot of panic when those those those fences went up. a lot of misinformation floating around. Appreciated the messaging that did get out. Uh should give my appreciation to SEFAX who happened to time a uh an interview that that was also timely to kind of make sure that to correct some of the public record and um um looking forward to the project proceeding and I'm very hopeful we're going to have something very spectacular at the end of all this. So um any notices of motions from members of council and then if not I will take a motion to adjurnn.
Move. Movement. Seconded. Uh, all those in favor? Any opposed? None opposed. Everybody get home safe in this cold and stormy night and we'll see you back here in December. Should we see the light up on Sunday? Yes. Don't miss it. I'll be there.