Staff presented a revised site plan for the townhouse proposal. It removes the requested side-yard setback and townhouse-block-size variances by changing block sizes and locations and redistributing units. Council supported bringing forward the rezoning bylaw for first, second and third readings at a future meeting, subject to the listed road dedication and covenant conditions. A speaker had asked about accessible trail design and winter maintenance during public participation. Staff said the route would be paved through the site, with the park section and creek crossing designed later; detailed design will be reviewed at the development-permit stage. One councillor opposed the proposal because it also permits a small apartment form. Staff clarified that it would be three stacked units, similar in height and scale to the townhouses.
Council agreed to consider advancing a zoning change for 953 Walfred Road at a future meeting, allowing townhouses and an apartment, subject to extensive conditions. Before adoption or building permits, the applicant must dedicate road space and parkland, provide stormwater, geotechnical, construction-management and mitigation plans, and meet frontage, tree-protection and low-carbon-concrete requirements. The conditions also require parking and landscaping covenants, revised building elevations, vehicle parking in garages, and public trails linking the site to Myles Mansel Road.
Official wording: THAT Council:
Consider bringing forward Bylaw No. 2279 for first, second and third readings at a future Council meeting in order to amend the zoning designation of the property located at 953 Walfred Road from RR5 (Rural Residential 5) Zone to RT3 (Residential Townhouse) Zone, and to amend the text of the RT3 Zone to allow for an apartment on the subject property, subject to the following terms and conditions:
That the applicant registers, prior to Bylaw Adoption, a road dedication plan dedicating 5 m of land along Walfred Road, to the satisfaction of the Director of Engineering and Public Works;
That the applicant, prior to Bylaw Adoption, registers a Section 219 covenant in priority of all other charges on title, that agrees to the following:
That the following will be provided and implemented to Bylaw No. 1000 standards to the satisfaction of the Director of Engineering and Public Works prior to the issuance of a building permit:
Full frontage improvements; and
A storm water management plan;
That the following will be provided and implemented to Bylaw No. 1000 standards to the satisfaction of the Director of Engineering and Public Works prior to any land alteration:
A comprehensive geotechnical plan;
A construction parking and deliveries management plan; and
A mitigation plan.
That a separate covenant be registered prior to issuance of a building permit for the proposed development that ensures that for apartment use, residential parking is allocated to each unit as required by the zoning bylaw and is not provided in exchange for compensation separate from that of a residential unit;
That a separate covenant is registered, prior to issuance of a building permit, that agrees that the strata be responsible for maintaining the boulevard landscaping from the back of the sidewalk, with the exception of boulevard trees;
That tree protection measures, including tree protection fencing, be implemented prior to the commencement of work and maintained throughout the construction period to protect the trees identified for retention in the arborist report;
That all concrete used on-site will utilize ready-mix concrete that meets or exceeds the weighted average Global Warming Potential targets based on Concrete BC Baseline (average) mix data, and that prior to the issuance of a Building Permit the applicant shall provide a Type III Environmental Product Declaration that is 3 rd party verified specifying the total Global Warming Potential value and confirming that the proposed development meets the requirements of Low Carbon Concrete Policy POL-0167-PLAN;
Provide a separate covenant to the City, prior to issuance of a Building Permit, agreeing that garages within the development are to be used for parking of vehicles and not the storage of items preventing the parking of vehicles therein;
That revised building elevations for Block 1 be submitted, demonstrating enhanced streetscape presence for the unit facing Walfred Road, to the satisfaction of the Director of Community Planning and Development as part of the Development Permit application;
That prior to the issuance of a Building Permit, the owner dedicate approximately 280 m² of land containing the stream as parkland, to the satisfaction of Director of Parks, Recreation, and Facilities;
That prior to the issuance of a Building Permit, the owner construct and secure, through a Statutory Right-of-Way in favour of the City, a 2.0 m wide public pedestrian trail through the site, to the satisfaction of the Director of Engineering and Public Works;
That prior to issuance of a Building Permit, the owner construct a pedestrian trail through the adjacent dedicated parkland to connect the pedestrian trail on-site with the pathway on Myles Mansel Road, and that, prior to the issuance of a Development Permit, the owner provide a cost estimate for the works, to the satisfaction of the Director of Parks, Recreation, and Facilities.